client: Stecon
cost: Baht 1,000 million
services to client: Preliminary and Detail Design
architect: Space Architects
structural engineer: SPC Consulting Engineers
m&e engineer: EEC
design: 2003
construction: 2004-06
Space Architects were responsible for the design of these two stations which are part of the Bangkok Transit SystemÂ’ extension of the Silom Line south section over the Chao Phrya River.